현대차 출고기간 “It looks like it will be shipped before installment approval”… Domestic cars with a shortened waiting period, is it too fast at best? < Industry News < General Automobile < Text of Article - Auto Tribune

현대차 출고기간Looking at Hyundai Motor Company’s models, the waiting period for shipment as of this month is Casper (gasoline), Avante N 2.0 Turbo, Santa Fe (diesel), Palisade (gasoline/diesel), Porter (double cab), and the hydrogen car Nexo can be available in just one month. there is. A two-month waiting period is expected for electric vehicles IONIQ 6 and Kona (gasoline/hybrid).
Popular car models Avante 1.6 and Santa Fe have a waiting period of 3 months for gasoline models. In addition, for the Grandeur, which is a popular model, you have to wait 4 months for the 2.5 gasoline model and 6 months for the 3.5 gasoline model to receive a new car.
However, hybrid models (Avante, Tucson, Santa Fe) require a waiting period of at least 6 months. Multi-seater mobility Staria can receive a new car in 2 months for the Cargo 3 model, 4 months for the Cargo 5 model, and 5 months for the Lounge model.
Genesis, which had a waiting period of more than two years for some models, is also stabilizing. For the G80 (2.5 gasoline turbo, 3.5 gasoline turbo), GV70 (2.0 gasoline turbo, 3.3 gasoline turbo), G70 Shooting Brake (2.0 gasoline turbo), and G90 (3.5 gasoline turbo) models, the waiting period is about 1 to 2 months. That’s as much as you can do.
Genesis electric vehicle models (G80, GV60, GV70) also have a relatively short waiting period of about 3 to 5 months. If you compromise on the panoramic sunroof option for both GV70 and GV80 models (2.5 gasoline turbo, 3.5 gasoline turbo, diesel), you can see a new car in 7 months.
Kia Motors also has a waiting period of about 1 to 2 months, except for some models such as Niro Hybrid, Seltos 2.0 Gasoline, and Ray Gravity. Morning, Ray (excluding Gravity), K5 2.0 gasoline, K8 gasoline (2.5·3.5), K9, and Mojave can all receive new cars in one month. All K3 models and Sorento (gasoline and diesel) all have a waiting period of about two months. Carnival, synonymous with family cars, also requires a waiting period of about 3 months for all models. Kia Motors also requires a waiting period of 4 to 14 months for hybrid models (K5, K8, Sportage, Sorento, etc.).
KG Mobility’s models, including Tivoli, Korando, Rexton, and Torres (excluding the two-tone model), can be shipped within one month, and Renault Korea vehicles can be shipped within 1 to 3 months for all models except hybrid models.
In general, analysis suggests that the long waiting period for electric and hybrid vehicles is due to high demand and the lack of automotive semiconductors that has not been completely resolved.
hbm@autotribune.co.kr

현대차 출고기간

하늘사랑